Gr1 – Gr23 ASTM / ASME / DIN / GB references Cut-to-size sawing · waterjet · laser Mill documentation MTC with every order MOQ friendly mixed grades & sizes

Quality & Documentation

Industrial buyers don't trust adjectives — they trust documents. This page explains exactly which paperwork accompanies a Tongke titanium order, what each document proves, and how to verify it on your side.

Buyer Guide: MOQ, MTC, samples, terms

The Document Set Per Shipment

What Ships With Your Order
DocumentProves
Mill Test Certificate (MTC)chemical composition + mechanical results per heat/lot, EN 10204 3.1 style
Packing listpiece-level lot mapping, weights, bundle counts
Certificate of Origin / commercial docscustoms paperwork chain
NDT report (where ordered)hydrostatic / UT / eddy-current result record
Third-party inspection report (where arranged)independent pre-shipment verification

MTC Field by Field

A Titanium MTC Should Show
FieldNote
Standard + revisione.g. ASTM B265 Gr2 — not just 'B265'
Heat & lot numberties to labels on every bundle
ChemistryC, N, O, Fe + alloying for Gr5/9/12/23
Mechanicaltensile, yield, elongation, hardness where spec'd
Test method + conditionannealed/STA etc., which specimen
Mill signatureproducer declaration, not trader paraphrase

Traceability Chain

Heat number (melt) → lot (rolling/drawing batch) &rarr> packing list line → invoice. Every delivered piece should tie back to an MTC line without a phone call. Where your class society or EPC paperwork demands witness testing, third-party inspection (SGS/BV family) is coordinated at the production base before dispatch.

What the documents do NOT say: our partner mills hold certifications (e.g. ISO 9001 at the Baoji production base) — those certificates belong to the producer, and where we show examples they are marked as production-partner documents. We are the sourcing, QC coordination and export side of the transaction. We'll never present someone else's certificate as ours.

Verify on Arrival (buyer's QC checklist)

☐ measure thickness/OD against MTC declared values (callipers/micrometer)
☐ check heat/lot numbers on labels vs MTC
☐ confirm surface & edge condition matches PO terms
☐ weigh a bundle vs theoretical (tube guide has the formula)
☐ retain one piece per lot for your own incoming test

How We Handle Quality Claims

Documented discrepancy → we open a mill case against the MTC line number with photos and measurements; resolution scope is agreed before replacement or credit. TBC: formal claim-window policy is confirmed per contract.

Dimensional inspection at the production networkBaoji production network workshop
Titanium mill products and machining at the Baoji network — the environment behind every MTC line.

Photos show inspection and production environment at the Baoji network, for capability illustration; they are not batch-specific certificates.

Tell us your spec — get a quotation

Send product, grade, dimensions and quantity. Typical reply: one business day, with documentation options.